
Quality PTM M
il y a 3 jours
Tanger, Tanger-Tetouan-Al Hoceima, Maroc
Valeo
Temps plein
30 000 - 60 000 par an
Project quality management/
- Define and monitor the quality roadmap for the project in order to meet quality (customer and VALEO) and cost objectives
- Define the quality cost of the project
- Monitor customer milestones
- Detect risks and prevent problems
- React when a risk is identified, Report obstacles to PG / PL management
Ensure Compliance With CPM
- Compliance with integrated quality standards
- Use of PPSC tracking sheet - Compliance with PPSC identification procedure - PPSC transfer to supplier via VRFs
- Challenge other PTMs in their activities
- Focus on design and change
- Ensure that product and process innovations are taken into account in DFMEA, PFMEA and DV&PV analyses.
- Check that LLCs have been used in the D/P FMEA to reduce RPN and meet safety requirements.
- Ensure compliance with the 4M matrix with regard to product or process changes, and that the customer is informed and approves changes in accordance with the 4M matrix.
- Update quality documents following product or process changes.
Participate in design reviews, including those of suppliers and tool manufacturers.
- Revise the control plan following a problem and/or test results.
Translated with (free version)
Support Supplier Management Activities
- You are in charge of the support activities defined for internal and external supplier parts at Valeo sites, to support purchasing and the SQA team, as defined in the Quality RASIC.
- Gather problems encountered by suppliers and alternative proposals made by suppliers to integrate best practices
- Have the IS validated by the customer in a timely manner
- Define prototype, pre-series and series control plans as owner of the stages.
- Ensure consistency between the PPSC, the FMEA and the control plan
- Participate in the preparation of the PRDF and the PRDF
- Prepare internal and customer IS deliverables, the internal initial sample file having to be validated by the site quality manager before presenting the initial sample file to the customer for signature.
- Participate in project QRQC and ensure that the project team uses QRQC documents and rules.
- Participate in the project QRQC and ensure that the project team uses the QRQC documents and rules.
- Throughout the project, the QRQC ensures that the rules are followed and that stop at first disagreement and stop at first are applied.
- Trigger a VIM incident if a DV or PV test fails
- Translated with (free version)